<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Rocklea to Darra Archives - Over The Walter Taylor Bridge</title>
	<atom:link href="https://overthewaltertaylorbridge.com.au/tag/rocklea-to-darra/feed/" rel="self" type="application/rss+xml" />
	<link>https://overthewaltertaylorbridge.com.au/tag/rocklea-to-darra/</link>
	<description>News and other stories about real people, places, and events in Over The Walter Taylor Bridge and nearby suburbs.</description>
	<lastBuildDate>Tue, 01 Sep 2020 10:48:33 +0000</lastBuildDate>
	<language>en-AU</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.5</generator>

<image>
	<url>https://overthewaltertaylorbridge.com.au/wp-content/uploads/2021/04/favicon-150x150.png</url>
	<title>Rocklea to Darra Archives - Over The Walter Taylor Bridge</title>
	<link>https://overthewaltertaylorbridge.com.au/tag/rocklea-to-darra/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Rocklea to Darra Upgrade Moves Forward With Oxley Creek Bridges Update</title>
		<link>https://overthewaltertaylorbridge.com.au/rocklea-to-darra-upgrade-moves-forward-with-oxley-creek-bridges-update/</link>
		
		<dc:creator><![CDATA[Emma]]></dc:creator>
		<pubDate>Tue, 01 Sep 2020 10:48:32 +0000</pubDate>
				<category><![CDATA[Ipswich Motorway Upgrade]]></category>
		<category><![CDATA[Oxley bridges]]></category>
		<category><![CDATA[Rocklea to Darra]]></category>
		<guid isPermaLink="false">https://overthewaltertaylorbridge.com.au/?page_id=17963</guid>

					<description><![CDATA[<p>The Rocklea to Darra upgrade on the eastern end of the Ipswich Motorway moves forward as new girders have been placed for the expanded bridges over Oxley Creek.&#160; Nearly 200 new girders have been installed as part of the two higher and wider Oxley bridges which will increase capacity and bring safer connectivity along the &#8230; <a href="https://overthewaltertaylorbridge.com.au/rocklea-to-darra-upgrade-moves-forward-with-oxley-creek-bridges-update/" class="more-link">Continue reading<span class="screen-reader-text"> "Rocklea to Darra Upgrade Moves Forward With Oxley Creek Bridges Update"</span></a></p>
<p>The post <a href="https://overthewaltertaylorbridge.com.au/rocklea-to-darra-upgrade-moves-forward-with-oxley-creek-bridges-update/">Rocklea to Darra Upgrade Moves Forward With Oxley Creek Bridges Update</a> appeared first on <a href="https://overthewaltertaylorbridge.com.au">Over The Walter Taylor Bridge</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p><strong>The Rocklea to Darra upgrade on the eastern end of the Ipswich Motorway moves forward as new girders have been placed for the expanded bridges over Oxley Creek.&nbsp;</strong></p>



<p>Nearly 200 new girders have been installed as part of the two higher and wider Oxley bridges which will increase capacity and bring safer connectivity along the Ipswich Motorway.&nbsp;</p>



<p>The Oxley bridges construction update is part of the $400-million Ipswich Motorway upgrade between Granard Road, Rocklea and Oxley Road, Oxley. The 3-km stretch is Stage 1 of the Ipswich Motorway upgrade and is considered the next most critical section of the remaining 7 km of the motorway that still needs upgrade.&nbsp;</p>



<figure class="wp-block-embed-youtube wp-block-embed is-type-video is-provider-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio"><div class="wp-block-embed__wrapper">
<iframe title="Ipswich Motorway Upgrade: fly over showing the bridge cutaway over Oxley Creek, Oxley" width="840" height="473" src="https://www.youtube.com/embed/3uJvvq5gSYo?feature=oembed" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
</div></figure>



<p>Stage 1 involves construction of a 1.5-km connection between Boundary Road east of Oxley Creek and Boundary Road at the Blunder Road intersection west of Oxley Creek.&nbsp;</p>



<hr class="wp-block-separator"/>



<p class="related"><strong><em>Read: </em></strong><a href="https://overthewaltertaylorbridge.com.au/francis-lookout-development-proposal/"><strong><em>Residents Oppose 3-Storey Development That Will Block Beloved Francis Lookout</em></strong></a></p>



<hr class="wp-block-separator"/>



<p>State Premier Annastacia Palasczuk said that despite the economic impact of COVID-19, Queensland continues to deliver an economic recovery plan that includes a $50 billion infrastructure guarantee.&nbsp;</p>



<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="1024" height="536" src="https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/2-1024x536.png" alt="" class="wp-image-17967" srcset="https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/2-1024x536.png 1024w, https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/2-300x157.png 300w, https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/2-768x402.png 768w, https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/2.png 1200w" sizes="(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px" /><figcaption>Photo credit: TMRQld/YouTube</figcaption></figure>



<p>“For roads and transport that means getting on with projects like the Ipswich Motorway upgrade and a record $23 billion roads and transport program, which will create 21,500 jobs,” Ms Palaszczuk said.</p>



<p>Federal Minister for Population, Cities and Urban Infrastructure Alan Tudge said that despite the pandemic, the project is on track for completion in early 2021.</p>



<p>“This is a targeted infrastructure investment to make the trip to work and back home safer for thousands of motorists every day,” said Mr Tudge.</p>



<p>“At the same time we’re injecting much needed funds into the Queensland economy and creating jobs for hard-working Queenslanders.&#8221;</p>



<figure class="wp-block-image size-large"><img decoding="async" width="1024" height="536" src="https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/3-1024x536.png" alt="" class="wp-image-17969" srcset="https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/3-1024x536.png 1024w, https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/3-300x157.png 300w, https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/3-768x402.png 768w, https://overthewaltertaylorbridge.com.au/wp-content/uploads/2020/09/3.png 1200w" sizes="(max-width: 709px) 85vw, (max-width: 909px) 67vw, (max-width: 1362px) 62vw, 840px" /><figcaption>Photo credit: TMRQld/YouTube</figcaption></figure>



<p>Senator for Queensland Paul Scarr hailed the project, saying that this would enhance flood resilience and reduce travel times.</p>



<p>“The project will support over 470 jobs at a time when creating and maintaining jobs has never been more critical,” said Senator Scarr said.</p>



<p>“Works will be delivered by Bielby Hull Albem Joint Venture – a Queensland-owned consortium.”<br></p>
<p>The post <a href="https://overthewaltertaylorbridge.com.au/rocklea-to-darra-upgrade-moves-forward-with-oxley-creek-bridges-update/">Rocklea to Darra Upgrade Moves Forward With Oxley Creek Bridges Update</a> appeared first on <a href="https://overthewaltertaylorbridge.com.au">Over The Walter Taylor Bridge</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: overthewaltertaylorbridge.com.au @ 2026-05-25 10:15:50 by W3 Total Cache
-->